- ClientGypsum Factory
- Value£137,000
- Duration7 weeks
- Removal of three ageing industrial burners
- Dismantling of associated ducting and steelwork
- Removal of a large conveyor drying unit
- Works delivered inside a live operational factory
- Controlled dismantling in areas with restricted headroom
- Safe management of asbestos-containing gaskets and textiles
- Set-up of a segregated dismantling and processing compound
- Continuous water suppression for dust control
- Transport of dismantled plant through active factory routes
- 100% recycling of scrap metal and compliant waste removal













View More Case Studies
Hope School, Wigan
Enabling Works | Asbestos | Demolition | Removal
- Carefoot PLC
- £320,000
- 8 weeks
Our scope included asbestos removal works, removal of fixtures and fittings, demolish individual structures, breakout foundations and reinforced slabs, removal of metal gates, fencing and concrete posts, breakout of concrete kerbing and bollards, disposal of Tarmacadam paving and crushing of hard breakout for future reuse.
DISCOVER THE FOX GROUP SERVICES